News
15 October 2009
Building Outdoor Walls of Monolithic Cellular Concrete
15 December 2008
![]() |
We present to you the building of outdoor walls of a car service via using heat insulation material: monolithic cellular concrete D300. The wall is 20 cm wide, equivalent to 25 cm wall of red bricks and coat. Reinforced 3 m belt of construction cellular concrete with fibres D600. Construction term for the wall is 7 days. The time for poring out in phases is 15 days with time for preparing the concrete 28 days. |
![]() |
It reaches it's full heat insulation capacities according to the outside temperature. |
![]() |
Concerning additional and competent information, the team of Vidar is always at your service. |
New kitchen
19 November 2008
We are presenting you one of our new projects. This kitchen is made of LPDCH material with a bar. In the bar we situated the sink with wide trough and built in soap-box. The glass panel witch connects spaces of the kitchen in visual point of view and dinning room, is installed on individual made non corrosive steel brackets, corresponding to the plinth and the grade non corrosive steel legs, also made of.
.jpg)
We use green glass for broad board and for turned glass case also. This creates density and refinement of kitchen’s view.
.jpg)
At the outside, to be kept the clean line of the kitchen, the handle of cupboard is replaced by system for opening with Push button.
.jpg)
For the back of this kitchen we used set of the face the kitchen, witch gives us individuality.
.jpg)












