News archive

Back

21 November 2013

Top


14 November 2013

Top


04 October 2013

Top


28 September 2013

Top


19 April 2013

Top


08 April 2013

Top


16 February 2013

Top


05 February 2013

Top


17 December 2012

Top


06 December 2012

Top


03 December 2012

Top


22 November 2012

Top


25 October 2012

Top


16 October 2012

Top


15 August 2012

Top


06 August 2012

Top


27 June 2012

Top


29 May 2012

Top


18 May 2012

Top


12 May 2012

Top


09 May 2012

Top


09 April 2012

Top


28 March 2012

Top


13 March 2012

Top


06 March 2012

Top


24 February 2012

Top


02 February 2012

Top


30 January 2012

Top


21 January 2012

Top


06 January 2012

Top


27 December 2011

Top


10 December 2011

Top


22 November 2011

Top


31 October 2011

Top


28 October 2011

Top


25 October 2011

Top


11 October 2011

Top


01 September 2011

Top


18 August 2011

Top


26 July 2011

Top


16 July 2011

Top


26 June 2011

Top


09 June 2011

Top


27 May 2011

Top


20 May 2011

Top


16 May 2011

Top


13 May 2011

Top


20 April 2011

Top


18 April 2011

Top


16 March 2011

Top


14 March 2011

Top


09 March 2011

Top


27 January 2011

Top


19 January 2011

Top


10 January 2011

Top


02 December 2010

Top


01 December 2010

Top


25 November 2010

Top


15 October 2009

Top


Building Outdoor Walls of Monolithic Cellular Concrete

15 December 2008

 

  We present to you the building of outdoor walls of a car service via using heat insulation material: monolithic cellular concrete D300.
 The wall is 20 cm wide, equivalent to  25 cm wall of red bricks and coat. Reinforced 3 m belt of construction cellular concrete with fibres D600.
 Construction term for the wall is 7 days. The time for poring out in phases is 15 days with time for preparing the concrete 28 days.
 It reaches it's full heat insulation capacities according to the outside temperature.
 Concerning additional and competent information, the team of Vidar is always at your service.
   
   

 

Top


New kitchen

19 November 2008

We are presenting you one of our new projects. This kitchen is made of LPDCH material with a bar. In the bar we situated the sink with wide trough and built in soap-box. The glass panel witch connects spaces of the kitchen in visual point of view and dinning room, is installed on individual made non corrosive steel brackets, corresponding to the plinth and the grade non corrosive steel legs, also made of.

We use green glass for broad board and for turned glass case also. This creates density and refinement of kitchen’s view.

At the outside, to be kept the clean line of the kitchen, the handle of cupboard is replaced by system for opening with Push button.

 

For the back of this kitchen we used set of the face the kitchen, witch gives us individuality.

Top


Transformation of bachelor’s room into mini three-room apartmen

13 June 2008


 

           

      According to the investor’s wish, an independent bedroom is made (room in the room) with two private entrances and own windows.
The doors have rubber gaskets for absorbing the noise and against penetration of smells.
Frosted glass secures the friendly atmosphere of the apartment. 
    Despite of the small space, the bed (164 to 200 cm) accommodates two persons and has two chests, three night-tables and dressing table.
In the apartment, there is a five-wing wardrobe with section for shoes; a bureau with table is inbuilt; the table is to be moved out in two directions or fully.

 

 

 
     
     
     
     
     
     
     
     

 

Top


Back

Web solution: Mindcraft Ltd